CIV102 bridge project
In CIV102, our group was tasked with building a truss bridge across a 150-metre valley. During the project, I produced the design drawing, and helped with some of the calculations.
Drawing showing the final design of our bridge - three Warren truss spans, 40, 70, and 40 metres long, respectively.
Scan of our final presentation materials
Our group explained the rationale of our design decisions in our design report.